About Our Red Iron Home Kits
Our barndominium home kits use 100% American-made Red Iron. The iron is not really red; it is coated with a red-tinted iron oxide mix. This RED primer creates a water-wicking barrier to protect the steel from the elements.
Our Red Iron Kits only include the structure, siding, roofing, and the parts needed to assemble it. Most of our red iron barndominium kits are weld-up, but we are working on bolt-up barndo kits.
- Engineered plans for the base metal structure are included (if you edit the structural plans, there will likely be engineering fees)
- Stamped Engineered Plans: Weld-up Buildings are challenging to get stamped because very few civil engineering firms understand the weld-up process. The cost to review and stamp engineered plans varies based on location. The homeowner is responsible for the cost to stamp the plan if they require stamped plans.
- Porch not included: Porch rafters and posts are typically made of wood and are not included in the base kit; however, you can add them.
- All wall girts, roof girts, and cutouts will be done on-site by the welder.
- Weld-up kits will provide the CNC cut clips for metal structures.
- All clips will be welded on-site by the contractor.
- Paneling is included in the client’s choice of standard colors.
- 26-Gauge R Panel for Roof & Walls is standard
*Color options for walls and trim.*Rake, Eave, Jamb, and corner trim all included in the package. - Peak boxes included
- Rake end caps included
- Colored Tek and Lap Tek screws are included for Panels.
- Butyl Tape and PBR closures are included.
- Doors and windows can be added in the kit configurator. Not included in the base price.
- Delivery varies from 2-4 weeks for weld up buildings and 6-10 weeks for bolt up red iron.
We offer different types of home kits. See all our barndominium kit types.